Lease contracts for wind farms and solar parks are lucrative

In many cases, the land can be put to dual use, so it’s a win-win situation

Does your land meet the requirements for building a solar park?

GERMANY, SPAIN, NETHERLANDS, ITALY AND DENMARK

Not in a nature conservation area

Your land should not be inside a nature conservation area. Regions with a high risk of flooding are also problematic. Further, solar parks have to located at least 200 m away from residential buildings. Wind farms have to be at least 800 m distant from the nearest residential building.

GERMANY, SPAIN, NETHERLANDS, ITALY AND DENMARK

At least 5 ha

Your land should extend uninterrupted over at least 5 hectares. Efficient PV plants can be planned and marketed on land that is larger than 5 hectares.

GERMANY, SPAIN, NETHERLANDS, ITALY AND DENMARK

<16° gradient (slope)

To guarantee maximum performance with minimum shade, the gradient (slope) of your land should not exceed 16°.

Get in Touch

Do you have any questions?  

Write to us - we will get back to you!

Christian Schede

Director Operations

These subjects may also be of interest

We are Encavis

Encavis is an Independent Power Producer (IPP) that generates electricity from renewable energy sources. As a leading independent electricity producer, we acquire and operate solar parks and wind farms across Europe. Our parks and farms help to safeguard a reliable supply of clean energy.  

We take responsibility for sustainability

Our core business – generating energy from renewable sources – lays the groundwork for a flourishing future. So does our sustainable business approach.

Stay informed

As we continue to grow, we’ve got lots of stories to tell! Take a look. Our newsroom contains something of interest for everyone.